A couple of weeks ago the house was cleaned and since then Metricon have been slowly ticking off the items that need to be resolved. At this point in time we're hoping to have our final inspection in a couple of weeks time.
VIEW ALL PHOTOS AS A SLIDESHOW
The garage door is now in and the automatic door control has also been fitted. The colour actually came up really well, but we're still waiting for the front of the house to be rendered in the final colour.
The splashbacks are in the kitchen, it has been completely cleaned and all except for a broken light it is looking great.
This is the view from the rear door entry
The view from the family room.
The painters have been around the house and have painted the electrical box on the outside of the house, they left the fibre box the standard colour.
The robe doors have been installed
The bathroom with lights on
The garage door control
Where the electrical pipe in the bedroom used to stick into the room.
The bedroom doors have finally been installed and stained, not sure what happened with the vent and light.
We have also ordered our blinds and will hopefully have them available before we move in so we can get them straight away to save us having to put up paper or blankets.
We had a bit of water getting into the roof due to some flashing or tiles issues so apparently that plaster has been replaced and painted. One of the broken windows has been replaced, but not the front window, hopefully this will be done over the next couple of weeks.
I'll try to give another update by next weekend, hopefully we get out final inspection date on Wednesday.
The view from the family room.
The painters have been around the house and have painted the electrical box on the outside of the house, they left the fibre box the standard colour.
The robe doors have been installed
The bathroom with lights on
The garage door control
Where the electrical pipe in the bedroom used to stick into the room.
The bedroom doors have finally been installed and stained, not sure what happened with the vent and light.
We have also ordered our blinds and will hopefully have them available before we move in so we can get them straight away to save us having to put up paper or blankets.
We had a bit of water getting into the roof due to some flashing or tiles issues so apparently that plaster has been replaced and painted. One of the broken windows has been replaced, but not the front window, hopefully this will be done over the next couple of weeks.
I'll try to give another update by next weekend, hopefully we get out final inspection date on Wednesday.