We dropped by the house tonight after seeing on MyMetricon that the painting had been completed. We arrived to find that the driveway area had been raised up to the level of the garage which initially had a drop off of about 30cms. The site has also been cleaned up a little bit.
The painting does appear to have finished however there are still a few outstanding issues:
1. The tri-stacker doors aren't in yet, however the painters stained the current doors (even though they'll be disappearing)
2. The electrical box pole is still sticking into the bedroom
3. No plaster work has been completed at all. The fridge cavity wall is still not straight and no cornices have been fixed.
The living room windows have been fixed the bricks were taken out last week, the seals were placed on the windows during the week and the bricks have been put back in. I forgot to check if the expansion joint in the alfresco had been fixed. Theoretically next week tiling was meant to start, however with some of the minor plaster issues it will be interesting to see if they proceed.
There were a few red dots around the place, I haven't had a call from my SS this week and it is highly unlikely I will now given he normally rings on a Wednesday or Thursday.
I'll hopefully have some more photo's taken from outside over the weekend.